Offshore Engineering Services

feature photo 1

Jingzhou Field Development Basic Design

Client: COOEC

completion time: 2013

COTEC Scope

  • Float-over standby mooring design
  • Float-over entry&exit design
  • Float-over mating design

Special Features

  • 1 CEP jackets (8 legs and 8 piles)
  • 1 WHP jackets (4 legs and 4 piles)
  • 1 WHP topsides (lifting weight 2800t)
  • 2 Bridges
  • 4 Remodifications

Deliverables

  • Analysis report
  • (in-place, installation , appurtenance)
  • Drawings
  • Material Take-off
  • Software: SACS,ANSYS
  • Special Features:
  • Ice thickness 73.8cm
  • Ice crack structure
  • Temporarylifting truss