Offshore Engineering Services

feature photo 1

DESIGN OF KL3-2 OIL FIELD DEVELOPMENT

Client: COOEC

completion time: 2013

COTEC Scope

  • 2 CEPA jackets (8 legs and 8 piles)
  • 5 WHP jackets (4 legs and 4 piles)
  • 5 WHP topsides (lifting weight 2700t)

Deliverables

  • Analysis report (in-place, installation and appurtenance)
  • Drawings
  • Material Take-off