Offshore Engineering Services

feature photo 1

Liuhua TLP Installation Study

Client: COOEC

completion time:2015

COTEC Scope

  • TLP transportation and installation design
  • Tendon/pile transportation and installation design
  • Operation manual for TLP float on, transportation, float off, wet tow and installation
  • Operation manual for installation of tendon, TBM, and piles
  • TTR installation design

Special Features

  • Shallow water depth of shipyard channel: 8.2m
  • Installation design with COOEC existing vessels

Deliverables

  • TLP dry transport and wet tow feasibility study
  • TLP pre-ratcheting operability analysis report
  • Feasibility studies for TLP tendon/pile installation with non-DP vessel
  • COOEC existing vessel feasibility studies for tendon/pile installation
  • TTR installation analysis report