Offshore Engineering Services

feature photo 1

KL10-1 Pipe Lifting and Shifting Design and Analysis

Client: CNOOC

Client: CNOOC

completion time: 2015

COTEC Scope

  • One 8” pipeline (40mm Concrete Coating) Lifting and Shifting Design and Analysis
  • One 8” pipeline (65 mm Concrete Coating) Lifting and Shifting Design and Analysis

Special Features

  • Shallow Water Depth (20 m)
  • Pipeline Davit Lifting and Shifting
  • Air Bags Distribution

Deliverables

  • Pipeline Lifting and Shifing Desigan and Analysis Report